Destava

Tool Install Schedule Manager, Peoria, AZ - Semiconductor

World Wide Professional Solutions is hiring for Tool Install Schedule Manager, Peoria, AZ - Semiconductor in Peoria, AZ. On-site, Manager level. First seen November 18, 2026; open as of November 18, 2026. Jobs taken straight from company career pages — no aggregator in between.

Save to applyFree forever. No commitment, no card required.

Company
World Wide Professional Solutions
Where
Peoria, AZ
Type
Full-time
Arrangement
On-site
Level
Manager
First seen
November 18, 2026
Listed via
Lever
Open for
Less than a day, as of November 18, 2026

About this job

This position is a full-time, on-location opportunity in Peoria, AZ, overseeing the integrated tool installation timeline for a large-scale semiconductor construction initiative. You will act for the owner, directing schedule creation, assessment, and status communication while aligning diverse contractors and stakeholders. This role demands sophisticated Primavera P6 expertise and comprehensive knowledge of semiconductor tool installation workflows.

Schedule: Full-time, onsite

Responsibilities

  • Manage and sustain the integrated tool installation timeline in Primavera P6, covering baselines, revisions, dependencies, milestones, resource and sequencing premises, and schedule documentation.
  • Combine contractor and trade timelines for tool delivery, positioning, installation, connection, process utilities, mechanical and electrical hookups, checks, validation, and construction handover.
  • Link tool installation milestones with equipment procurement and arrival, shell and cleanroom readiness, utility provisioning, access limitations, and commissioning and startup handoffs.
  • Gather timeline inputs from construction supervisors, tool installation contractors, OEMs, engineering teams, procurement, facilities, and the owner's project controls group.
  • Track critical and near-critical routes, interface constraints, float movements, and milestone delays; deliver early alerts and actionable mitigation or recovery strategies.
  • Facilitate weekly schedule alignment, progress confirmation, and short-range lookahead planning with trade partners; back pull planning and Last Planner System methods when applied.
  • Monitor quantifiable installation advancement, construction completions, and readiness milestones by tool, zone, system, and contractor; align field status with the master timeline.
  • Assess proposed schedule modifications, resequencing, acceleration efforts, and time effects; document assumptions, constraints, decisions, and authorized changes thoroughly.
  • Deliver the owner's team clear weekly and monthly schedule summaries, milestone dashboards, critical path assessments, deviation explanations, and executive-ready recovery proposals.
  • Question inaccurate or partial contractor schedule submissions and confirm progress through site observations, documented status, and feedback from responsible discipline leads.
  • Support cross-functional settlement of schedule disputes without taking direct oversight of contractor craft execution.
  • Encourage safe, high-quality work planning and compliance with project standards, cleanroom rules, and site safety requirements.

Requirements

  • At least seven years of increasing construction scheduling or project controls experience on major capital projects, with proven leadership of complex, integrated timelines.
  • Proven background in scheduling semiconductor tool installation, including tool-specific construction sequencing and coordination of multiple trade partners.
  • Expert-level capability in Primavera P6, including CPM logic, baselines, progress updates, float analysis, and schedule reporting.
  • Practical understanding of tool installation construction sequencing and interfaces across process piping, specialty gases, UPW, CDA, vacuum, exhaust, electrical, and controls systems.
  • Capacity to merge inputs from multiple contractors and data sources into a credible master schedule and convey schedule risk to owner and executive stakeholders.
  • Robust Excel, reporting, analytical, negotiation, facilitation, and written and verbal communication skills; organized, proactive, and effective in a dynamic field environment.

Nice to have

  • Background supporting an owner's representative, EPCM, general contractor, or major semiconductor facilities delivery organization.
  • Experience with Lean Construction, pull planning, Last Planner System, schedule risk analysis, and multi-contractor interface management.
  • Experience directing schedulers or schedule integration workstreams; familiarity with Power BI, databases, or automation for reporting is advantageous.
  • Degree in Construction Management, Engineering, or a related field preferred; equivalent relevant experience considered.

Benefits

  • Relocation support or per diem and travel packages may be offered to eligible candidates, depending on assignment needs and company policy.
  • Full benefits package including medical, dental, vision, life insurance, short-term and long-term disability, a company-matched 401(k), paid holidays, and paid time off.

Read more and apply on World Wide Professional Solutions' site

Questions about this job

When was this Tool Install Schedule Manager, Peoria, AZ - Semiconductor job at World Wide Professional Solutions posted?

Destava first saw it on November 18, 2026, on World Wide Professional Solutions' own careers page (Lever).

Is World Wide Professional Solutions still accepting applications for it?

It was open on World Wide Professional Solutions' own site when Destava last read it, on November 18, 2026. When the company takes it down, this page says the job has closed.

How do I apply for Tool Install Schedule Manager, Peoria, AZ - Semiconductor at World Wide Professional Solutions?

On World Wide Professional Solutions' own site, at jobs.lever.co: open the posting. Destava does not take the application. Save the job to your Destava board to track it, see how well you fit and tailor your résumé to it.

Is this World Wide Professional Solutions job posting legit?

Destava read it on World Wide Professional Solutions' own careers page at jobs.lever.co, run on Lever, not on a job board. First seen November 18, 2026. Apply on the company's own site, and never pay to apply for a job.

Is this job remote?

No. The posting says the work is on site in Peoria, AZ.

What other jobs is World Wide Professional Solutions hiring for?

World Wide Professional Solutions has 50 open postings on its own site: see all jobs at World Wide Professional Solutions.

How many first-line supervisors of production and operating workers jobs are open in Phoenix?

63 open, 11 of them new this week, at 40 companies: see them all.

Applying to this one?

See how well you fit, before you apply

Save it to your board. Add your résumé once, and Destava shows where you are strong, what is missing and how to pitch yourself, then tailors your résumé to this posting.

  1. Found it
  2. Save it
  3. See your fit

Free forever. No commitment, no card required.

Or apply on World Wide Professional Solutions' own site

With Destava: Save to apply · Tailor my résumé · Write a cover letter

This page includes information from the O*NET 31.0 Database by the U.S. Department of Labor, Employment and Training Administration (USDOL/ETA). Used under the CC BY 4.0 license. O*NET® is a trademark of USDOL/ETA.