Maintenance Planner
Camaco is hiring for Maintenance Planner in Columbus Manufacturing. Mid level. First seen November 13, 2026; open as of November 18, 2026. Jobs taken straight from company career pages — no aggregator in between.
Save to applyFree forever. No commitment, no card required.
- Company
- Camaco
- Where
- Columbus Manufacturing
- Level
- Mid
- First seen
- November 13, 2026
- Listed via
- Workday
- Open for
- 5 days, as of November 18, 2026
- Experience asked
- 3 to 5 years
Applying to this one?
See how well you fit, before you apply
Save it to your board. Add your résumé once, and Destava shows where you are strong, what is missing and how to pitch yourself, then tailors your résumé to this posting.
- Found it
- Save it
- See your fit
Free forever. No commitment, no card required.
About this job
This role plans, prioritizes, and schedules all maintenance work for production and the facility. The planner coordinates with operations, engineering, and maintenance managers to manage work orders and assign tasks to craftsmen. The position works under the maintenance manager's direction and follows the TPM system.
Schedule: Weekends or evenings when necessary to support the plant.
Responsibilities
- Collaborate with Operations, Engineering, and Quality departments.
- Maintain plant systems to ensure parts availability, minimize downtime, control spare parts inventory, and manage the maintenance budget.
- Work with vendors, enter purchase orders, and handle spare parts transactions, including obtaining emergency parts outside normal hours.
- Learn current systems, develop new ones, and train related personnel.
- Schedule outside contractors and coordinate with Production to complete work.
- Enter work orders into Plex and provide reports to the maintenance manager on work order closure.
- Work with the maintenance manager to develop and improve Preventive Maintenance based on lessons learned.
- Manage annual contracts with contractors.
- Chase hot parts for emergency breakdowns and run errands to pick up parts as needed.
- Perform all other duties as assigned.
Requirements
- Associates degree or certification in a Technology discipline (Mechanical, Electrical, Manufacturing), or 5 years of experience with demonstrated skill set.
- Understand planning and scheduling fundamentals.
- Proficient with computer applications (Word, Excel).
- Organized and able to work with little supervision.
- Able to work in a team environment.
- Basic computer skills, Microsoft Office and ERP experience.
- Able to lift 50lbs.
- Basic knowledge of maintenance functions: Electrical, Hydraulics, Pneumatics, Stamping, Mig welding, Resistance welding, Robotics, Tooling, and E-coat systems.
- Able to work weekends or evenings when necessary.
- Technical capacity, organizational skills, teamwork orientation, problem solving/analysis, computer proficiency (Microsoft Office including Word, Excel, PowerPoint), MRP and MPS systems, ability to communicate with all levels including customers and suppliers, confidentiality.
- No supervisory responsibilities.
- Regularly works in an office setting with occasional plant floor visits.
Nice to have
- Familiarization and experience with scheduling methods highly desirable.
Read more and apply on Camaco's site
Questions about this job
When was this Maintenance Planner job at Camaco posted?
November 13, 2026
Destava first saw it on November 13, 2026, on Camaco's own careers page (Workday).
Is Camaco still accepting applications for it?
Open as of November 18, 2026
It was open on Camaco's own site when Destava last read it, on November 18, 2026, 5 days after we first saw it. When the company takes it down, this page says the job has closed.
How do I apply for Maintenance Planner at Camaco?
On Camaco's own site
On Camaco's own site, at camacollc.wd108.myworkdayjobs.com: open the posting. Destava does not take the application. Save the job to your Destava board to track it, see how well you fit and tailor your résumé to it.
Is this Camaco job posting legit?
Listed on Camaco's own careers page
Destava read it on Camaco's own careers page at camacollc.wd108.myworkdayjobs.com, run on Workday, not on a job board. First seen November 13, 2026. Apply on the company's own site, and never pay to apply for a job.
How much experience does it ask for?
3 to 5 years
3 to 5 years.
How many production, planning, and expediting clerks jobs are open in Columbus?
64 open
64 open, 22 of them new this week, at 50 companies: see them all.
More jobs like this
Inventory Planning Clerk
Save to applyMaintenance Planner
Save to applyParts Coordinator
Save to applyLoad Planner
Save to apply
See all 64 Production, Planning, and Expediting Clerks jobs in Columbus
A search agent finds the jobs this list misses: the ones that mean the same without the same words. Have Destava watch for maintenance planner jobs in Columbus Manufacturing, new matches every morning on your own account.
With Destava: Save to apply · Tailor my résumé · Write a cover letter
This page includes information from the O*NET 31.0 Database by the U.S. Department of Labor, Employment and Training Administration (USDOL/ETA). Used under the CC BY 4.0 license. O*NET® is a trademark of USDOL/ETA.